| Availability: | |
|---|---|
| Quantity: | |
200V08102-0634
Sinotruk HOWO
| Attribute | Specification |
|---|---|
| Official Name | Middle Section Exhaust Manifold Assembly |
| Common Names | Exhaust Manifold Mid-Section, Exhaust Collector Block |
| OEM Brand | SINOTRUK (China National Heavy Duty Truck Group) |
| Part Number | 200V08102-0634 |
| Material | High-nickel ductile cast iron or heat-resistant alloyed cast iron |
| Heat Resistance | Withstands continuous temperatures up to 700°C–750°C; short-term peaks higher |
| Manufacturing Process | Precision sand casting + post-casting heat treatment |
| Surface Quality | Smooth internal passages; oxidation-resistant surface layer resists spalling |
| Weight | Approx. 5.5 kg – 6.5 kg (varies slightly by production batch) |
| Design Type | Bolt-on flanged connection; integrates into multi-segment manifold system |
| Function | Collects and directs exhaust pulses toward turbocharger turbine housing |
| Emission Compatibility | Designed for use with Euro V/VI and China V/VI compliant powertrains |
| Origin | Jinan, Shandong Province, China |
Name1
Name2
Confirm correct model: Use SINOTRUK EPC system to verify compatibility with your VIN/chassis.
Inspect new unit: Check for cracks, porosity, deformation, or damaged threads on mounting flanges.
Clean mating surfaces: Remove all old gasket material, carbon buildup, and rust from adjacent components.
Prepare hardware: Have new high-temperature exhaust gaskets and M10×1.5 bolts ready.
Apply Anti-Seize Lubricant:
Coat bolt threads with high-temperature anti-seize compound (copper-based paste) to prevent seizing during future maintenance.
Position the Manifold Section:
Align carefully with upstream (front manifold) and downstream (turbo inlet) ports.
Do not force misaligned flanges.
Install New Gaskets:
Place new metal exhaust gaskets on both sides.
Never reuse old gaskets — they lose resilience after thermal cycling.
Insert and Tighten Bolts:
Stage 1: 30% torque
Stage 2: 60% torque
Final: 80–90 N·m (confirm exact value per service manual)
Insert bolts finger-tight first.
Torque in crisscross sequence in multiple stages:
Final Inspection:
Ensure no binding or stress on connected piping.
Visually check clearance from wiring, hoses, and frame rails.